- EPA proposes to approve Virginia's **partial** coal combustion residuals (CCR, or coal ash) permit program under RCRA.
Document ID: EPA-HQ-OLEM-2025-3325-0001 | Docket ID: EPA-HQ-OLEM-2025-3325
Agency: (EPA)
Type: Archived Analysis | Comment End:
Scores: pass_1= (scaled ), pass_2= (scaled ), combined=0%
Structural Risk:
Pass 2 Type:
Structural Flags
None
Rule Text Sources
None
Referenced Documents
None detected in cached rule/comment text.
What This Document Does
- EPA proposes to approve Virginia's partial coal combustion residuals (CCR, or coal ash) permit program under RCRA.
- If finalized, Virginia would administer the approved portion of the CCR program through its own permitting system instead of the federal self-implementing program.
- The approval is only partial because Virginia did not adopt every later federal CCR amendment. EPA says some federal requirements would still apply directly in Virginia even after approval.
- The record includes a real technical support document, state regulations, EPA's 2017 state-program guidance, and an appendix showing which federal provisions Virginia would replace and which would remain federal.
Why It Matters
- This is a governance rule with real on-the-ground consequences for coal ash units. It affects who regulates which requirements, when permit shield protections apply, and how communities can track compliance.
- Virginia's program is not being approved as a clean substitute for the whole federal CCR rule. EPA is proposing a split system:
- Virginia permits and state regulations would govern the approved portion.
- Federal rules would still govern omitted areas, including legacy CCR surface impoundments, CCR management units, and several post-2020 federal amendments.
- EPA and Virginia both say existing Virginia permits would later need major modification so they become permits issued under an approved state program. That means approval alone does not instantly simplify compliance.
- Virginia also has some stricter state requirements. The biggest example in this record is mandatory closure by removal for certain CCR impoundments in the Chesapeake Bay watershed and in Giles and Russell counties.
Who Is Affected
- Electric utilities and independent power producers operating CCR landfills or surface impoundments in Virginia.
- Communities near those units, especially where closure, groundwater monitoring, or permit changes are contested.
- Virginia DEQ, which would become the lead permitting authority for the approved portion of the program.
- EPA, which would still enforce the federal provisions that remain directly applicable.
- Tribal governments and other public participants who want to understand which regulator controls which requirements.
Issues Worth Commenting On (0-6)
Issue: The split federal/state regime may be legally valid but still hard to follow in practice.
- Why it matters: EPA says omitted federal provisions will continue to apply directly, while approved Virginia provisions will operate in lieu of federal law. That can create confusion for facilities and the public unless the boundary is explained clearly.
- Practical question a commenter can ask: Can EPA add a simple facility-facing summary showing which requirements remain federally applicable for active units, legacy impoundments, and CCR management units after approval?
Issue: Existing Virginia permits still need to be reviewed and modified after approval.
- Why it matters: The record says Virginia will initiate review of existing permits and issue major modifications after federal approval. Until that happens, the transition to permit-shield protection may be less clear than the proposal suggests.
- Practical question a commenter can ask: What is the expected timeline and sequencing for reviewing and modifying existing Virginia CCR permits after final approval?
Issue: Some "at least as protective" conclusions are stronger in outcome than in explanation.
- Why it matters: The docket has meaningful support, but several conclusions rely on EPA concurrence stated at a high level. That leaves room for comments asking EPA to show more of its reasoning, especially for omitted post-2020 federal amendments.
- Practical question a commenter can ask: Please explain in more detail why the approved Virginia provisions remain at least as protective where later federal rules changed definitions, closure obligations, or groundwater-related requirements.
Issue: Public accountability may suffer if overlapping authority is not communicated clearly.
- Why it matters: Coal ash regulation often matters most when residents are trying to understand closure plans, groundwater obligations, or permit enforcement at a specific facility. A mixed regime can make that harder.
- Practical question a commenter can ask: How will EPA and Virginia identify, in public documents for each facility, whether a disputed requirement comes from an approved state permit, a still-applicable federal rule, or both?
Issue: The record says future program review will handle some implementation questions.
- Why it matters: Future review is normal, but commenters can still ask EPA to explain why the current record is enough now despite acknowledged transition work that still lies ahead.
- Practical question a commenter can ask: What implementation questions does EPA believe can safely wait for later program reviews, and which should be clarified in the final approval record now?
Evidence Quotes
- "EPA has preliminarily determined that Virginia's partial CCR permit program meets the standard for approval under RCRA."
- "If approved, Virginia's CCR permit program would operate in lieu of the Federal CCR program ... with the exception of the provisions specifically identified below..."
- "For the Commonwealth provisions that are not approved upon finalization, the corresponding federal requirements will continue to apply directly to facilities..."
- "Upon federal approval of Virginia's partial CCR permit program, VADEQ will initiate a review of existing solid waste permits ... and issue a modification..."
- "EPA concurs with VADEQ that these Commonwealth-specific requirements provide enhanced protection for human health and the environment..."
Administrative Rulemaking Structural Review
EPA-HQ-OLEM-2025-3325-0001
Phase 1 — Docket Integrity Check
Classification: Full analytical spine present
Observed Fact
The selected document is the substantive NPRM itself, not an extension, correction, or reopening notice. The title, document type, and rule text all align on a proposal to approve Virginia's partial coal combustion residuals permit program under RCRA section 4005(d).
The available record includes the NPRM text plus a meaningful supporting spine. Cached materials include:
EPA-HQ-OLEM-2025-3325-0026- EPA Technical Support Document for approval of Virginia's CCR permit program.EPA-HQ-OLEM-2025-3325-0021- EPA's August 2017 interim guidance for state CCR permit programs.EPA-HQ-OLEM-2025-3325-0034- appendix mapping which federal CCR provisions Virginia would supplant and which would remain federally applicable.EPA-HQ-OLEM-2025-3325-0023- the Virginia Solid Waste Management Regulations effective January 2025.
The TSD explains the application package, the legal and permitting framework, the comparison between Virginia and federal requirements, the list of federal provisions that would remain directly applicable, and EPA's reasoning for calling several Virginia-specific provisions "at least as protective as" the federal baseline.
Inference
This is a stronger record than a thin NPRM that relies only on preamble assertions. The main support is present. The harder question is whether EPA has explained the practical consequences of a partial approval clearly enough for the public, especially where existing Virginia permits would later need major modification and where some post-2020 federal requirements would continue to apply directly.
Why that matters
For public comments, the most useful leverage is not to claim that EPA lacks any support. The record is real. The leverage is to ask EPA to sharpen how the split federal/state regime will work in practice, how facilities and communities will know which requirements remain federal, and why the specific omitted amendments do not create transition risk.
Phase 2 — Claim-Centered Analysis
Step 0 — Extract Agency Reasoning Claims
Claim 1
Category: CONCLUSION Quoted sentence: "EPA has preliminarily determined that Virginia's partial CCR permit program meets the standard for approval under RCRA." Location: Summary / Overview of Proposed Action Procedural relevance: Core approval conclusion Support type: preamble explanation plus docket cited
Claim 2
Category: SCOPE Quoted sentence: "If approved, Virginia's CCR permit program would operate in lieu of the Federal CCR program ... with the exception of the provisions specifically identified below for which the Commonwealth is not seeking approval and for which the corresponding provisions of the Federal CCR program would remain in effect." Location: Overview of Proposed Action Procedural relevance: Defines the scope of partial approval Support type: preamble explanation plus docket cited
Claim 3
Category: METHOD / LEGAL Quoted sentence: "The State's submission will be compared to the federal CCR part 257 requirements and must be at least as protective as those." Location: 2017 EPA guidance, Chapter 1 Procedural relevance: States the comparison method EPA says it is using Support type: docket cited
Claim 4
Category: CONCLUSION Quoted sentence: "EPA has determined that the Virginia CCR regulations contain all of the technical elements of the federal CCR regulations..." Location: TSD Section III.1.b Procedural relevance: Central equivalence conclusion about the state's technical criteria Support type: docket cited
Claim 5
Category: CONCLUSION / SCOPE Quoted sentence: "For the Commonwealth provisions that are not approved upon finalization, the corresponding federal requirements will continue to apply directly to facilities, and therefore facilities must comply with both the federal requirements and the Commonwealth requirements." Location: TSD Section III.1.b Procedural relevance: Explains the direct compliance consequences of partial approval Support type: docket cited
Claim 6
Category: CONCLUSION Quoted sentence: "EPA concurs with VADEQ that these Commonwealth-specific requirements provide enhanced protection for human health and the environment..." Location: TSD Section V.1 Procedural relevance: Supports approval of Virginia's closure-by-removal requirements Support type: docket cited
Claim 7
Category: METHOD / CONCLUSION Quoted sentence: "EPA reviews state CCR permit program applications primarily on the legal and regulatory framework that a state puts forward." Location: TSD Section III.3 Procedural relevance: Explains the limits of EPA's review method Support type: docket cited
Claim 8
Category: CONCLUSION Quoted sentence: "Upon federal approval of Virginia's partial CCR permit program, VADEQ will initiate a review of existing solid waste permits for CCR landfills and CCR surface impoundments and issue a modification..." Location: TSD Section III.3 Procedural relevance: Describes the transition from existing state permits to permits issued under an approved program Support type: docket cited
Step 1 — Claim Stress Test
Major claim: the Virginia program is at least as protective as the federal program for the approved portion
Underlying assumption
EPA's line-by-line comparison correctly captures where Virginia is identical to federal law, where it is more protective, and where omitted federal amendments can safely remain federal without undermining the program as a whole.
Failure scenario
If the omitted post-2020 federal amendments materially affect current compliance expectations for active units, then describing the approved Virginia portion as sufficiently protective may hide transition complexity that the public and operators need to understand better.
Procedural implication
Comments can ask EPA to show the practical compliance map more concretely, not just the legal conclusion.
Major claim: dual federal/state applicability is manageable
Underlying assumption
Facilities, regulators, and the public can reliably determine which provisions have shifted to Virginia permits and which still apply directly under federal law.
Failure scenario
Facilities misunderstand the split, communities cannot track which authority applies to a disputed unit or requirement, or existing permits are slow to be modified after approval.
Procedural implication
EPA should explain the transition mechanics, timing expectations, and public-facing tools for understanding the split regime.
Major claim: facial review of the legal and regulatory framework is enough at the approval stage
Underlying assumption
EPA does not need extensive facility-specific implementation evidence now because future program reviews and permit actions will address implementation quality later.
Failure scenario
If implementation weaknesses are already foreseeable from the transition design, deferring those questions to later reviews may leave a preventable clarity gap in the initial approval record.
Procedural implication
Commenters can ask for more explanation of why the record is sufficient now despite the acknowledged need for later permit modification and future program review.
Step 2 — Essence of the Rule
Observed Facts
EPA proposes to approve Virginia's partial CCR permit program under RCRA section 4005(d). Virginia incorporated federal CCR regulations through December 14, 2020 into its solid waste regulations, added state permitting procedures and certain Virginia-specific requirements, and asked EPA to approve only part of that program. EPA's TSD says the approved portion would operate in lieu of federal requirements, while omitted federal provisions would continue to apply directly. Those omitted areas include post-2020 federal amendments, legacy CCR surface impoundments, CCR management units, and several specific provisions such as parts of slope-stability vegetation, groundwater-monitoring suspension, certain groundwater protection standards, updated owner/operator definitions, and some closure-by-removal and post-closure requirements.
Inference
This is a program-approval NPRM, not a direct technical redesign of coal ash standards. The practical stakes are governance and enforceability: who regulates which units, under which text, at what point existing Virginia permits actually gain permit-shield effect, and whether the split regime is sufficiently legible to support informed public participation and oversight.
Step 3 — Agency Argument Tree
Regulatory objective Allow Virginia to run an EPA-approved partial CCR permit program in lieu of the federal self-implementing program for the covered portion of the rule.
Problem definition RCRA allows states to seek approval of CCR permit programs, and Virginia has submitted a partial program built from its existing waste-management statutes, regulations, and permitting system.
Data used Virginia's application package, the state narrative description, legal certification, state statutes and regulations, the EPA checklist review, the 2017 guidance, and EPA's TSD comparison of federal and Virginia requirements.
Analytical method EPA compares Virginia's submission against 40 CFR part 257 and determines whether each approved element is identical to or at least as protective as the federal program, while leaving omitted or newer federal requirements directly applicable.
Alternatives considered The record clearly contemplates approval in whole or in part, but gives less analysis of other design choices within the partial-approval framework, such as how much transition detail EPA should require before approval or whether additional public-facing compliance mapping is needed for omitted amendments.
Agency conclusion Virginia's partial program meets the statutory approval standard, and EPA should approve it after notice, comments, and a hearing.
Missing links / unsupported premises / logical jumps
- The record clearly identifies what remains federal, but it is less concrete about how facilities and the public will navigate that split day to day.
- EPA says existing permits will later be reviewed and modified, but the record is lighter on timing, prioritization, and what happens before those modifications are complete.
- "At least as protective" is supported with substantive examples, especially closure-by-removal rules, but some equivalence conclusions still rely on high-level concurrence rather than detailed public-facing discussion of implementation consequences.
Step 4 — Analysis Obligations Review
Adequate data: Satisfied For this kind of program-approval NPRM, the record includes the core legal, regulatory, and explanatory documents needed to evaluate the proposal.
Transparent methodology: Partially satisfied EPA identifies the comparison approach and walks through many provisions, but some conclusions are still summarized at a high level.
Evaluation of reasonable alternatives: Partially satisfied The record addresses partial approval as a lawful option, but does not deeply analyze alternative transition designs or stronger clarity mechanisms for the split regime.
Explanation of analytical thresholds: Partially satisfied The legal threshold is clear: identical to, or at least as protective as, the federal requirements. But the record is thinner on how much transition uncertainty EPA is willing to tolerate before approval.
Consideration of foreseeable impacts: Partially satisfied EPA discusses permit modifications, federal requirements that remain in place, and future program review. The practical burden of navigating overlapping authorities is acknowledged, but not explored in detail.
Step 5 — Missing Alternatives Detector
Regulatory objective: approve a partial state CCR permit program while preserving federal coverage for omitted provisions
Alternatives evaluated
The record considers partial approval versus non-approval and explains that omitted elements remain federally applicable.
Plausible alternatives not analyzed in depth
- Require a clearer public-facing crosswalk keyed to existing Virginia permits before final approval.
- Explain whether priority permit modifications should be issued first for units most affected by omitted federal amendments.
- Describe whether EPA should condition or stage approval around permit-transition milestones.
- Provide a more explicit implementation timeline for when the public can expect Virginia-issued permits to replace federal self-implementation for covered units.
Evidence suggesting feasibility
EPA already prepared a state-versus-federal applicability appendix and acknowledges that existing permits will need major modification. That shows more transition detail could be provided without changing the legal theory of the NPRM.
Stage-aware classification
Potential unacknowledged weakness. Partial approval itself is normal and explicitly authorized. The weaker point is the relative lack of public-facing detail about how the split regime will function before permit modifications are complete.
Step 6 — Technical Coherence
Observed Fact
The proposal is internally coherent. Virginia incorporated federal CCR requirements through December 14, 2020, added state permitting machinery and some stricter state requirements, omitted certain later federal amendments, and EPA explains that only the approved portion would operate in lieu of the federal program.
Inference
The main vulnerability is not contradiction. It is operational opacity. The legal logic of partial approval is clear, but the record gives less practical detail than a reader may need to understand compliance obligations during the transition period.
Unknown
The available record does not show a concrete schedule for reviewing and modifying each existing Virginia CCR permit after approval.
Step 7 — Legal Grounding
Observed Fact
EPA grounds the proposal in RCRA sections 4005(d) and 7004(b)(1), and the 2017 guidance repeatedly states that a state submission must be compared to the federal CCR requirements and must be at least as protective as those requirements.
Inference
The likely vulnerability is not basic statutory authority. It is whether EPA has adequately explained how its partial-approval decision preserves clarity, enforceability, and meaningful public participation where multiple regimes remain in force at once.
Unknown
The public-facing record does not fully show how disputes over mixed federal/state applicability would be communicated to affected communities at specific facilities.
Step 8 — Procedural Normalcy
Classification: Normal
Observed Fact
This is an ordinary NPRM with a 60-day written comment period and a hybrid public hearing. EPA also describes tribal consultation that occurred before proposal and says final action will follow consideration of comments.
Inference
The procedural opening is not an unusual notice defect. The opening is to use the comment period to force sharper explanation of implementation, permit transition, and residual federal applicability.
Step 9 — Failure Modes
Facilities may misread which federal provisions remain directly applicable after approval.
Existing Virginia permits may take time to be reviewed and modified, leaving a potentially confusing interim period.
Members of the public may not know whether to evaluate a facility under permit terms, self-implementing federal provisions, or both.
Future federal amendments could widen the divergence between Virginia's approved program text and the current federal baseline unless updates are pursued promptly.
Enhanced state requirements such as closure by removal may be protective in substance while still generating communication challenges when paired with continuing federal requirements for other unit categories.
Step 10 — Regulatory Incentives
Observed Fact
Approval would let Virginia administer the approved portion of the CCR program through its own permitting system, and existing facilities would later seek permit modifications so the permit-shield framework could apply to Commonwealth-issued permits.
Inference
That creates an incentive for both the state and operators to move permits into the approved-program framework. It also creates an incentive to treat the remaining federal provisions as background rather than central obligations, which is why the residual-federal map needs to be especially clear.
Step 11 — Evidentiary Strength
Overall assessment: Moderately strong
Strengths
- EPA provides a real TSD rather than relying only on the preamble.
- The record identifies specific omitted provisions and unit categories.
- The record includes state statutes, regulations, and an applicability appendix.
- EPA gives a concrete example of stronger state requirements through Virginia's closure-by-removal mandates.
Weaknesses
- The record is less specific about permit-transition timing and sequencing.
- Some "at least as protective" conclusions are stated more than demonstrated in public-facing detail.
- The dual-regime compliance burden is acknowledged, but not deeply unpacked for ordinary readers.
Step 12 — Administrative Record Gaps
Gap 1
Gap type: Transition clarity for existing permits Why this matters for commenters now: Existing Virginia permits do not automatically become permits issued under an approved state program; the record says they will later be reviewed and modified. Agency already solicits input on this point? No
Gap 2
Gap type: Public-facing compliance map for omitted federal provisions Why this matters: The appendix is helpful, but the record would be easier to use if EPA summarized the practical consequences for active facilities and nearby communities more clearly. Agency already solicits input? No
Gap 3
Gap type: Implementation timing Why this matters: The record does not explain how quickly VADEQ expects to modify existing permits after approval or how priorities will be set. Agency already solicits input? No
Gap 4
Gap type: Distributional and community impact discussion Why this matters: Coal ash governance decisions can matter directly to communities near legacy and active units, but the NPRM is stronger on legal structure than on who may bear transition risks if the split regime is confusing. Agency already solicits input? No
Step 13 — Litigation Vulnerabilities
The main vulnerability theme is explanation adequacy under a partial-approval structure.
Potential pressure points:
- whether EPA sufficiently explains how the split federal/state regime will function before permit modifications are complete,
- whether the public can readily tell which requirements remain federally enforceable at a given unit,
- whether the record provides enough public-facing support for certain "at least as protective" conclusions beyond high-level concurrence,
- whether EPA should say more about how future federal amendments and future state program reviews will interact with current approval.
Phase 3 — Comment Generation
Step 14 — Commentable Sentences
- "EPA has preliminarily determined that Virginia's partial CCR permit program meets the standard for approval under RCRA."
- "If approved, Virginia's CCR permit program would operate in lieu of the Federal CCR program ... with the exception of the provisions specifically identified below..."
- "EPA has determined that the Virginia CCR regulations contain all of the technical elements of the federal CCR regulations..."
- "For the Commonwealth provisions that are not approved upon finalization, the corresponding federal requirements will continue to apply directly to facilities..."
- "Upon federal approval of Virginia's partial CCR permit program, VADEQ will initiate a review of existing solid waste permits ... and issue a modification..."
- "EPA concurs with VADEQ that these Commonwealth-specific requirements provide enhanced protection for human health and the environment..."
Step 15 — Procedural Concern Score
Score: 4.5 / 10
Reasoning: This is a fairly complete and normal program-approval NPRM, so the score is not high. The concern level rises because the approval is only partial, many existing facilities will remain in a mixed regime for some period, and the record could do more to explain how that complexity will be managed and communicated.
Step 16 — Evidence Requests
A commenter could request:
- a facility-facing summary of which federal provisions remain directly applicable after approval and how that applies to currently permitted Virginia CCR units,
- a clearer explanation of the permit-transition process, including expected sequencing and timing for major permit modifications after approval,
- a more explicit discussion of how EPA concluded that the approved Virginia provisions remain at least as protective where later federal amendments changed definitions, closure, and groundwater-related requirements,
- clarification of how the public will be informed, at each facility, whether a disputed requirement comes from an approved state permit, residual federal self-implementation, or both,
- explanation of how future program reviews will address any lag between federal amendments and later Virginia adoption.
Step 17 — High-Leverage Comment Angles
1. Ask EPA to explain the transition from existing Virginia permits to approved-program permits
A strong comment can accept that partial approval is lawful while asking EPA to explain how and when existing permits will actually be modified so the permit shield applies.
2. Ask EPA to make the split regime legible to the public
The record would be stronger if EPA added a concise public-facing compliance map for active units, legacy impoundments, and CCR management units.
3. Ask EPA to substantiate "at least as protective" conclusions where federal amendments were omitted
Commenters can focus on the practical consequences of omitted post-2020 amendments rather than treating the entire program as unsupported.
4. Ask EPA to discuss community-facing consequences of regulatory overlap
Where communities track CCR closure, groundwater monitoring, and permit compliance, a mixed regime can create accountability confusion unless responsibilities are clearly explained.
Step 18 — Decision Brief
Strongest leverage point
"For the Commonwealth provisions that are not approved upon finalization, the corresponding federal requirements will continue to apply directly to facilities..."
Routine description situated in context
EPA plainly has authority to approve state CCR programs in whole or in part, and Virginia has assembled a serious application record. The best comment angle is therefore not abstract opposition to state approval. It is the practical question of whether EPA has explained the compliance consequences of partial approval clearly enough for regulated entities, communities, and later enforcement.
Regulatory effectiveness / statutory compliance / procedural adequacy
The proposal is legally grounded and materially supported, but the administrative record would be more durable if EPA gave the public a clearer explanation of permit transition, residual federal applicability, and how overlapping obligations will be communicated at specific facilities.
Real-world consequence of invoking the leverage
If commenters press this point effectively, EPA may supplement the final record with a clearer transition explanation or more usable applicability guidance. That would improve public oversight and reduce the risk that approval produces avoidable confusion rather than a clean handoff of authority.
No agency reasoning graph is available for this document.
Commenter types: n/a
Submission roles: n/a
Submission channels: n/a
Selection: balanced_v1 | first-page coverage 100% | stance mix negative: 3 | positive: 2 | neutral: 1 | days represented 4
Freshness (ET): bulk snapshot n/a | API last seen n/a
Sampling basis: Unknown | Representative: 0 selected (0 prior, 0 new) | Cap: 0/period | Sample size: 0 | Must-keep: 0 | Run budget: 0 | Overflow: no | Missing archive: 0 (prior 0) | Backfill: in progress (next page 1, sort postedDate)
| Count | Sentiment | Channel | Representative Comment ID | Date | Chars | Representative Excerpt |
|---|---|---|---|---|---|---|
| 1 | positive | Public | EPA-HQ-OLEM-2025-3325-0038 | 2026-05-15 | 2776 | Analysis of the use and strategic disposal of coal and its waste must consider the additional cost to communities of increased healthcare spending and lost productivity due to adverse health effects caused by high levels of CCR. Additionally, the benefits of cleaning waste facilities of CCR in the Chesapeake Bay Watershed provide unrealized economic... |
| 1 | positive | Public | EPA-HQ-OLEM-2025-3325-0036 | 2026-05-07 | 4194 | US EPA, OA. “EPA Proposes to Deny Alabama’s Coal Ash Permit Program and Better Protect Local Communities from Pollution.” Www.epa.gov, 3 Aug. 2023, www.epa.gov/newsreleases/epa-proposes-deny-alabamas-coal-ash-permit-program-and-better-protect-local. “Virginia: Approval of State Coal Combustion Residuals Permit Program.” Federal Register, 4 May 2026, www.... |
| 1 | negative | Public | EPA-HQ-OLEM-2025-3325-0035 | 2026-05-07 | 2236 | Good afternoon, my name is Lindsey, and I am a student studying environmental law at the University of Tennessee. EPA-HQ-OLEM-2025-3325. I have personal experience with the dangers of coal combustion residuals (CCR), having lived near Kingston, Tennessee — the site of the 2008 Kingston Coal Ash spill, one of the largest industrial disasters in American... |
| 1 | negative | Public | EPA-HQ-OLEM-2025-3325-0037 | 2026-05-07 | 1509 | This rule is essentially a partial deregulation of CCRs, which can often be extremely toxic. For example, the Kingston coal ash spill has been linked to the deaths of dozens of cleanup workers, most or all of whole were exposed do to lax oversight and dedication to PPE guidelines by a contractor. We have solid evidence of how these substances impact human... |
| 1 | neutral | Public | EPA-HQ-OLEM-2025-3325-0039 | 2026-05-19 | 2535 | Whether state implementation mechanisms provide sufficiently durable and independent oversight capacity over time. I also encourage EPA to carefully consider cumulative environmental burdens affecting communities located near coal ash disposal facilities, including impacts to drinking water resources, surface waters, ecosystems, and environmental justice... |
| 1 | negative | Public | EPA-HQ-OLEM-2025-3325-0040 | 2026-07-02 | 2047 | The Subcommittee appreciates EPA acting on Virginia’s permit program application and supports EPA’s proposed decision to approve Virginia’s CCR permit program. The EPA process for approving State CCR permit programs is an issue of long-standing importance to ASTSWMO. The Association has issued formal statements on CCR permit program implementation. The... |
No supporting attachment metadata available in current site export.