Proposed Deletion from the National Priorities List

Docket EPA-HQ-OLEM-2026-4886 · Environmental Protection Agency

Comment View document on Regulations.gov

Document ID: EPA-HQ-OLEM-2026-4886-0001 | Docket ID: EPA-HQ-OLEM-2026-4886

Agency: Environmental Protection Agency (EPA)

Type: Proposed Rule | Comment End: 2026-09-22T03:59:59Z

Scores: pass_1=9 (scaled 70%), pass_2=0 (scaled 0%), combined=25%

Pass 4: raw=0 (scaled 0%)

Structural Risk: Likely Routine (Structural)

Pass 2 Type: LEGAL_PROCEDURAL

Structural Flags

  • routine_admin_closure_context
  • routine_admin_downrank_applied

Pass 4 Axes

None

Pass 4 Signals

None

Rule Text Sources

Referenced Documents

Detected: 2 unique references, 2 total mentions.

Type ID Mentions From comments From rule text
docket EPA-HQ-OLEM-2025-2499 1 0 1
docket EPA-HQ-OLEM-2026-3994 1 0 1

Not available for this document.

AI-generated summary: This material is produced by automated analysis and may be incomplete or wrong. It is informational only, not legal advice. Verify key claims against the source record and use independent judgment before commenting.

Not available for this document.

AI-generated summary: This material is produced by automated analysis and may be incomplete or wrong. It is informational only, not legal advice. Verify key claims against the source record and use independent judgment before commenting.

No agency reasoning graph is available for this document.

Total comments
2
Fetched sample
1
Hydrated text
2
Unique clusters
2
Clustered duplicates
0
Source
api
Citizen comments
2
Novel cluster share
100%
Public channel
2
Recorded channel
0
Agency material
0
Positive
50%
Negative
0%
Neutral
50%
Net sentiment
Net: +50%
Sentiment sample
2

Commenter types: citizen: 2

Submission roles: individual: 2

Submission channels: public_portal: 2

Selection: balanced_v1 | first-page coverage 100% | stance mix positive: 1 | neutral: 1 | days represented 2

New clusters/day
WkMoTuWeThFr
11
21
High-signal/day
no data

Freshness (ET): bulk snapshot n/a | API last seen Sep 22, 2026, 2:00 AM ET

Sampling basis: Representative sample | Representative: 2 selected (2 prior, 0 new) | Cap: 5K/period | Sample size: 2 | Must-keep: 2 | Run budget: 0 | Overflow: no | Missing archive: 0 (prior 0) | Backfill: in progress (next page 1, sort -postedDate)

Comment sample is truncated for performance.

Displayed / analyzed clusters
2/2
High-signal on page 1
0
Novelty on page 1
0
Represented comments
2/2
Count Sentiment Channel Representative Comment ID Date Chars Representative Excerpt
1 positive Public EPA-HQ-OLEM-2026-4886-0021 2026-09-18 4999 There are multiple OUs within Fort Riley; however, OU2 is the area up for removal. OU2 was a pesticide storage facility area (EPA 2026). At the time of the creation of the Fort Riley Superfund site, OU2 was designated as a non-time-critical removal of contaminated soil. This was completed in 1994. Argument/Position: As previously stated, the EPA has strict...
1 neutral Public EPA-HQ-OLEM-2026-4886-0023 2026-09-21 4938 The people who were mainly affected were lower income African American people. They rely on Medicaid which does not cover everything, especially something of this specialization and severity (“Historical Blood Lead Levels in East Chicago, Indiana Neighborhoods Impacted by Lead Smelters”). High lead levels in blood have negative long term health effects...
Page 1 of 1
Document ID Title Subtype Date Authors Pages
EPA-HQ-OLEM-2026-4886-0022 Proposed Deletion from the National Priorities List; Correction 2026-09-21 1
EPA-HQ-OLEM-2026-4886-0011 Draft Final Project Report for Rapid Response Removal of Contaminated Soils 2026-06-29 725
EPA-HQ-OLEM-2026-4886-0013 Draft Final Remedial Investigation Addenda 2026-06-29 Law Eng'g and Env'l Svcs, Inc Gov't Services Div 299
EPA-HQ-OLEM-2026-4886-0004 Federal Facility Agreement Docket No. VII-90-0015 2026-06-29 98
EPA-HQ-OLEM-2026-4886-0005 Draft Final Engineering Evaluation Cost Analysis (EE CA) for the Pesticide Storage Facility 2026-06-29 241
EPA-HQ-OLEM-2026-4886-0016 Five-Year Review Report Installation Restoration Program Fort Riley Kansas 2026-07-01 Directorate of Environment and Safety 80
EPA-HQ-OLEM-2026-4886-0018 Third Five-Year Review Report Draft Final Fort Riley Junction City Geary, Clay and Riley Counties Kansas 2026-07-01 US Army 209
EPA-HQ-OLEM-2026-4886-0019 Use of Monitored Natural Attenuation at Superfund RCRA Corrective Action and Underground Storage Tank Sites 2026-07-01 USEPA 41
EPA-HQ-OLEM-2026-4886-0007 Final Technical Memorandum July 2009 Soil Sampling Event Pesticide Storage Facility 2026-06-29 10
EPA-HQ-OLEM-2026-4886-0008 Proposed Plan Pesticide Storage Facility Operable Unit 002 Fort Riley Kansas 2026-06-29 8
EPA-HQ-OLEM-2026-4886-0009 Record of Decision Pesticide Storage Facility Operable 2026-06-29 48
EPA-HQ-OLEM-2026-4886-0014 Action Memorandum for Removal Action Pesticide Storage Facility Fort Riley Military Installation Fort Riley Kansas 2026-07-01 The United States Department of the Army 18
EPA-HQ-OLEM-2026-4886-0015 Draft Final Installation Wide Site Assessment for Fort Riley, Kansas 2026-07-01 Louis Berger & Associates, Inc. (LBA) 349
EPA-HQ-OLEM-2026-4886-0012 Draft Final Remedial Investigation for Remedial Investigation Feasibility Study 2026-06-29 940
EPA-HQ-OLEM-2026-4886-0003 Discussion Paper Impacts of Alternative Development and Evaluation 2026-06-29 Law Environmental, Inc. 74
EPA-HQ-OLEM-2026-4886-0006 Partial Deletion Justification Fort Riley OU2 2026-06-29 21
EPA-HQ-OLEM-2026-4886-0017 Second Five-Year Review Report Fort Riley Kansas 2026-07-01 US Army Corps of Engineers 89
EPA-HQ-OLEM-2026-4886-0020 State of Kansas Deletion Concurrence Letter 2026-08-11 Muhammed Jallow 2
EPA-HQ-OLEM-2026-4886-0002 Deletion Docket Index of Documents 2026-06-29 1
EPA-HQ-OLEM-2026-4886-0010 Draft Final Remedial Investigation Addendum and Feasibility Study Report for Remedial Investigation Feasibility Study 2026-06-29 429